0 Mėgstami
0Krepšelis

Exact solution methods of project scheduling problems

27,28 
27,28 
2025-07-31 27.2800 InStock
Nemokamas pristatymas į paštomatus per 13-17 darbo dienų užsakymams nuo 19,00 

Knygos aprašymas

Seminar paper from the year 2002 in the subject Business economics - Operations Research, grade: 1,9, http://www.uni-jena.de/ (Lehrstuhl für ABWL, insb. Betriebswirtschaftliche Entscheidungsanalyse), course: Quantitative Methoden der Projektplanung, language: English, abstract: The use of project management is continuously growing in industrial and public organizations providing an efficient instrument for mastering the challenges caused by steadily shortening product life cycles, decreasing profit margins, and global markets. One of the main tasks in project management is the scheduling of the project, that is, the temporal arrangement of activities. Resources are required to perform activities and are available with limited capacities. Therefore, within the project management the activities are to be scheduled subject to precendence and resource constraints. In practice, different types of resources may occur. Renewable resources (e.g. machines) are available at each point in time. Nonrenewable resources (e.g. money) are depleted by use. These resources only affect the scheduling of activities if activities can be carried out in alternative modes which differ, for example, in duration and amount of resources needed. To describe these scheduling problems we use mathematical models. The techniques to solve resource constrained project scheduling problems are descriebed with branch and bound methods.

Informacija

Autorius: Carsten Heuring
Leidėjas: GRIN Verlag
Išleidimo metai: 2007
Knygos puslapių skaičius: 32
ISBN-10: 3638684962
ISBN-13: 9783638684965
Formatas: Knyga minkštu viršeliu
Kalba: Anglų
Žanras: Operational research

Pirkėjų atsiliepimai

Parašykite atsiliepimą apie „Exact solution methods of project scheduling problems“

Būtina įvertinti prekę

Goodreads reviews for „Exact solution methods of project scheduling problems“