0 Mėgstami
0Krepšelis

Probabilistic Safety Assessment and Management ¿96: ESREL¿96 ¿ PSAM-III June 24¿28 1996, Crete, Greece Volume 1

169,38 
169,38 
2025-07-31 169.3800 InStock
Nemokamas pristatymas į paštomatus per 13-17 darbo dienų užsakymams nuo 19,00 

Knygos aprašymas

IE-2 > FV 5E-3 > FV IE-3 > FV IE-4 > FV Trun- Total IST and IST Components Total IST FV> IE-2 Type >5E-3 > IE-3 > IE-4 >0 cated IPE Components Not Modeled in PRA Components 11 3 6 5 27 73 100 AOV 2 CV 4 21 24 16 12 77 94 171 4 6 10 HOV 4 34 158 MOV 2 5 35 33 24 25 124 43 43 MV 2 PORV 1 1 2 PUMP 12 5 6 1 3 27 9 36 54 54 SOV SRV 20 3 23 23 Total 39 17 73 61 49 45 284 313 597 ------- --- Table 2. Levell IPEEE Basic Event Importance - Risk Achievement Worth Total IST and (PE IST Components Not Total IST 2>RAW>0 Truncated Type RAW>2 Components Modeled in PRA Components 100 AOV 13 9 5 27 73 CV 52 16 9 77 94 171 4 4 6 10 HOV MOV 60 54 10 124 34 158 43 43 MV PORV 2 2 2 PUMP 24 3 27 9 36 SOV 54 54 SRV 23 23 23 597 Total 155 102 27 284 313 ~~--- -. . j S 702 and 2 includes the following IST component types: pumps, air-operated valves (AOV), check valves (CV), hydraulically-operated valves (HOV), motor-operated valves (MOV), manual valves (MV), pressurizer power-operated relief valves (PORV), solenoid operated valves (SOV), and safety reliefvalves (SRV).

Informacija

Leidėjas: Springer London
Išleidimo metai: 2012
Knygos puslapių skaičius: 796
ISBN-10: 1447134117
ISBN-13: 9781447134114
Formatas: Knyga minkštu viršeliu
Kalba: Anglų
Žanras: Systems analysis and design

Pirkėjų atsiliepimai

Parašykite atsiliepimą apie „Probabilistic Safety Assessment and Management ¿96: ESREL¿96 ¿ PSAM-III June 24¿28 1996, Crete, Greece Volume 1“

Būtina įvertinti prekę

Goodreads reviews for „Probabilistic Safety Assessment and Management ¿96: ESREL¿96 ¿ PSAM-III June 24¿28 1996, Crete, Greece Volume 1“